Geotechnical & Core Drilling Services

Drill Grade Ability

  

  • Straight ahead climb at a 46% grade
  • Slide-hill traverse at a 36% grade
  • Angle drilling system

Drill Features

  

  • Rubber tracks
  • 7 ft wide drill footprint
  • In place turning radius

Our Drills are compact and lightweight

  

  • Transported between job sites effortlessly.
  • Crosses bridges with ease and acceptable to low-weight marked structures.
  • Limits clearing areas.

Different Samples We offer are:

  

  • Split Spoon Sampling
  • Shelly Tube Samples
  • Pressure Packer Testing
  • Auger Drilling
  • Rock Core Samples

SLSWV

Glenville, WV

SLSWV

Charleston, WV